Khatanga
The seaport of Khatanga is located on the right shore of the Khatanga River flowing into Khatanga Bay in the Laptev Sea, 115 miles from the mouth. The port functions only during the summer navigation (from the middle of June until the end of September). The port can admit vessels with the draught of up to 4.6m. Loading from sea to river vessels is carried out at the Cape of Kosistiy. There are 5 mooring berths at the port of Khatanga which are flooded ships, barges, and pontoons. The total length of the mooring wall is approximately 350 metres. Commodities and refrigerated cargoes, various general cargoes for the Arctic urban areas, timber and bulk freights (coal, sand and gravel mixtures), and bulk oil cargoes are handled at the port. The services to handle cargoes are provided by ZAO Sea Commercial Port of Khatanga.
Location
GPS | 71° 59′ N.; 102° 28′ E. |
Location | the right bank of the Khatanga river flowing into the Khatanga Gulf of the Laptev Sea, 115 miles from the mouth of the river |
Navigation duration | 90 days |
Ice covered period | September - May |
Nearest settlements | village Khatanga, town Norilsk - 600 km. |
Railway station | yes, Norilsk - 600 km. |
Airport | yes, Alykel - 620 km. |
Oil terminal | no |
Infrastructure
Port Berths | |||||
Berth № | Purpose | Length, m. | Depth along side, m. | Ship's Draft, m. | Berth Owner |
1 | port fleet | 5,0 | 4,5 | Khatanga Commercial Sea Port | |
2 | 5,0 | 4,5 | |||
3 | general cargo | 350,0 | 5,0 | 4,5 | |
4 | 350,0 | 5,0 | 4,5 | ||
5 | oil products | -- | 5,0 | 4,5 |
Port Technical Equipment | |||||
Company |
Equipment |
Storage place capacity |
|||
Khatanga Commercial Sea Port | 3 floating cranes, 3 crawler cranes, 1 autocrane, 6 forklift trucks |
openair - 17 500 square meters |
According to the Federal Tariff Service of Russia Order № 522-т/1 dated 20.12.2007
(as amended by Orders dated 17.04.09, 14.10.09, 24.12.09, 22.06.10, 22.03.11, 26.07.11, 13.09.11, 04.05.12.)
Rates of the Port Dues in Khatanga port
Table 14.1 - Foreign voyage vessels
Name of the fee | Rate, RUB/1 GT | ||
All vessels, except for Ro-Ro vessels, Float-on / Float-off ships, container ships, and tankers | Ro-Ro vessels, Float-on / Float-off ships, container ships | Tankers | |
Tonnage Dues | 6,75 | 4,73 | 7,38 |
Pilotage Dues | |||
In-port pilotage, per operation | 0,57 | 0,40 | 0,62 |
External pilotage, per mile | 0,19 | 0,13 | 0,21 |
Light Dues | 2,37 | 1,66 | 2,59 |
Navigation Dues | |||
Including VTMS | |||
Ecological Dues | |||
Canal Dues | |||
Ice Dues |
Table 14.2 - Cabotage vessels
Name of the fee | Rate, RUB/1 GT | ||
All vessels, except for Ro-Ro vessels, Float-on / Float-off ships, container ships, and tankers | Ro-Ro vessels, Float-on / Float-off ships, container ships | Tankers | |
Tonnage Dues | 2,12 | 1,48 | 2,32 |
Pilotage Dues | |||
In-port pilotage, per operation | 0,28 | 0,20 | 0,31 |
External pilotage, per mile | 0,09 | 0,07 | 0,10 |
Light Dues | 1,18 | 0,83 | 1,30 |
Navigation Dues | |||
Including VTMS | |||
Ecological Dues | |||
Canal Dues | |||
Ice Dues |