Loading...
 
[Show/Hide Left Column]

Dikson        
Print

Dikson

The seaport of Dikson is located in the south-western part of the Kara Sea near the mouth of the Yenisey River. Summer marine navigation is possible from the middle of August until the end of September. Winter navigation is possible all year round with assistance of the icebreaker fleet. The port’s objective is to provide viability of the settlement of Dikson, Arctic expeditions and polar stations. MUE Dikson Sea Commercial Port is involved in handling of cargoes at the port. The basis of cargo turnover is general cargoes, timber freights, coal, gravel, sand, and oil products. During summer navigation local passenger transportations are carried out. The Dikson port owns 8 mooring berths located at the main pier, in Portovaya Bay, and on the islands of Dikson and Konus. The depth near the mooring berths is 15 metres and allows for loading operations from vessels with l/c of up to 50 thousand tons.

Location

GPS 73° 30′ N.; 80° 30′ E.
Location The South-eastern part of the Kara Sea at the entrance of the Yenisey Gulf
Navigation duration yearround
Ice covered period September (October) - June (July)
Nearest settlements village Dikson, town Norilsk - 540 km.
Railway station yes, Dudinka - 500 km.
Airport yes, Dikson - 4 km.
Oil terminal no

Infrastructure

Port Berths
Berth № Purpose Length, m. Depth along side, m. Ship's Draft, m. Berth Owner
1 general cargo 100,0 14,0   Dikson Commercial Sea Port
2 100,0 14,0  
Island Sakhalin oil products      
7      
Auxiliary Berths
Island Konus Southern berth mooring berth      
Island Konus Western berth ship repair      
Passenger Berths
Portovaya bay service   5,0  
Island Dikson passenger     --

 

Port Technical Equipment

Company

Equipment

Storage place capacity

Dikson Commercial Sea Port 3 portal cranes, 3 crawler autocranes, 1 truck autocrane, 4 forklift trucks open air - 10 000 square meters, closed - 4 000  square meters

According to the Federal Tariff Service of Russia Order № 522-т/1 dated 20.12.2007 
(as amended by Orders dated 17.04.09, 14.10.09, 24.12.09, 22.06.10, 22.03.11, 26.07.11, 13.09.11, 04.05.12.)

Rates of the Port Dues in Dikson port

Table  14.1 - Foreign voyage vessels

Name of the fee RateRUB/1 GT
All vessels, except for Ro-Ro vessels, Float-on / Float-off ships, container ships, and tankers Ro-Ro vessels, Float-on / Float-off ships, container ships Tankers
Tonnage Dues   6,75 4,73 7,38
Pilotage Dues     
In-port pilotage, per operation           0,57 0,40 0,62
External pilotage, per mile               0,19 0,13 0,21
Light Dues       2,37 1,66 2,59
Navigation Dues      
Including VTMS        
Ecological Dues      
Canal Dues      
Ice Dues      

Table 14.2 Cabotage vessels

Name of the fee RateRUB/1 GT
All vessels, except for Ro-Ro vessels, Float-on / Float-off ships, container ships, and tankers Ro-Ro vessels, Float-on / Float-off ships, container ships Tankers
Tonnage Dues   2,12 1,48 2,32
Pilotage Dues     
In-port pilotage, per operation           0,28 0,20 0,31
External pilotage, per mile               0,09 0,07 0,10
Light Dues       1,18 0,83 1,30
Navigation Dues      
Including VTMS        
Ecological Dues      
Canal Dues      
Ice Dues      

 

 


Search Guide [toggle]

Last-Visited Pages [toggle]